RevOps Central → Services → CRM Implementation

CRM implementation
that sticks.

We configure, build, and migrate your CRM — then stay for 90 days post-go-live to make sure your team is actually using it. Kickoff to go-live in 6–10 weeks. Fixed fee, not hourly.

Salesforce · HubSpot · Pipedrive · Zoho · Dynamics · Close US & Australia 90-day adoption guarantee Fixed fee, not hourly
Typical engagement cost
$15k $55k

Fixed fee. Scope-dependent. No hourly billing.

  • Standard implementation (no migration): $15,000–$35,000
  • Implementation with data migration: $24,000–$55,000
  • Kickoff to go-live: 6–10 weeks standard, 8–14 weeks with migration
  • 90-day adoption period included in every engagement
  • You speak to a senior consultant — not a project coordinator
  • Platform-agnostic: we hold no vendor certifications or referral arrangements
  • Free 45-min discovery call before any proposal
Book a free 45-min call → Detailed pricing breakdown ↓
Is this page for you?

Six situations where this is exactly the right conversation to have

We work with mid-market companies between 25 and 500 people, typically with sales teams of 5 to 80 reps. If any of the situations below sound familiar, you're in the right place.

VP of Sales · B2B SaaS

You're about to sign a Salesforce contract and you're terrified it'll end up like the last one.

You've been here before. Go-live happened, the partner left, and six months later your reps were working from spreadsheets again. Now there's pressure from the board to "fix the CRM" and you're not sure what fixing actually means.

Salesforce · HubSpot · 30–150 people · First or second implementation
COO · Professional Services

You inherited a CRM from your predecessor that nobody trusts. Cleaning it up feels impossible.

The system was built by someone who is no longer here. Nobody knows why the pipeline stages are the way they are. The data is a mess. You know it needs to be rebuilt but you're not sure if you need to migrate to a new platform or just fix what you have.

Salesforce · Dynamics 365 · Melbourne or Sydney · 50–200 people
CEO · PE-Backed Scale-Up

Your board wants pipeline visibility. Your CRM can't deliver it because nobody's using it correctly.

You're in a growth phase, possibly post-acquisition or post-fundraise. Your PE sponsor wants clean pipeline data. Your Monday call still runs from a shared spreadsheet because your CRM numbers aren't trusted. This is not a technology problem.

HubSpot · Salesforce · Austin TX · Denver CO · 80–350 people
Head of RevOps · Manufacturing

You're one person trying to manage a CRM rollout across three regions with no budget for a full implementation team.

You know what good looks like. You don't have the bandwidth to build it yourself. You need a partner who'll do the architecture and the build work while you stay close to the process and the reps who'll eventually use it.

Pipedrive · HubSpot · Brisbane or Perth · 25–100 people
VP Sales · Technology Distributor

You're migrating from one CRM to another and you're worried about losing 4 years of deal history.

The old system doesn't work anymore. You've chosen the new one. What you don't know is how to get the data across cleanly, what to keep, what to archive, and how to not lose the pipeline context that your reps have lived in for years.

Pipedrive → HubSpot · Zoho → Salesforce · Any migration · 40–200 people
Sales Director · B2B Services

You're 30 people and you've outgrown spreadsheets but you're not sure which CRM is right for where you're going.

At 30 people, informal systems start breaking down. You're losing deals you shouldn't be losing because there's no visibility. You know you need a CRM but the market is confusing and every vendor says theirs is the right one for you.

First CRM · HubSpot · Pipedrive · Zoho · US or AU · 20–50 people
Why CRM implementations fail

The partner left at go-live. That's the whole problem.

Between 49% and 70% of CRM implementations fail to deliver their intended value. The reasons cited consistently are the same ones year after year: poor adoption, not enough post-launch support, and systems configured for how a consultant thought the team worked rather than how they actually work.

The technology isn't the problem. HubSpot, Salesforce, Pipedrive — they all work. The problem is what happens in the 90 days after go-live, when the partner has submitted their invoice and your reps are facing a system they weren't consulted about, can't navigate quickly, and don't yet trust.

49–70%

CRM projects fail to deliver intended value

Forrester, Merkle Group, and C5 Insight have all reported failure rates in this range. The percentage has not improved meaningfully in 20 years.

83%

Of senior executives say their biggest CRM challenge is getting staff to use it

Really Simple Systems survey. This is not a training problem. It's an architecture and adoption problem.

73%

Of our clients had a previous failed implementation

Our own data from 60+ engagements since 2019. This is the situation we specialise in.

The seven reasons the last one didn't work
  • 01

    The system was built around the manager's reporting needs, not the rep's daily workflow

    Reps are the primary users. When the CRM is designed to serve dashboards and forecast calls rather than make a rep's job easier, they stop using it. Managers get data they can't trust because nobody entered it.

  • 02

    Pipeline stages were copied from a template, not designed around your actual sales process

    Every stage name matters. "Proposal Sent" and "In Negotiation" look like stages — but they're not milestones that a rep can objectively evaluate. When stages are ambiguous, deals get stuck in them indefinitely and forecasting becomes guesswork.

  • 03

    Nobody stayed to observe the first 90 days of actual use

    Every CRM looks good at go-live demo. The friction reveals itself in week three, when a rep can't find the information they need in the moment they need it. Without someone watching usage data and talking to reps, that friction becomes permanent.

  • 04

    Data was migrated but not cleaned first

    Moving bad data from one system to another doesn't clean it — it just makes a newer, more expensive home for the mess. Duplicate contacts, inconsistent company names, and orphaned records destroy trust in the data from day one.

  • 05

    Training was a single session, not embedded in the management rhythm

    One-day training events don't change behaviour. CRM adoption improves when using the system is the path of least resistance in every sales meeting, every pipeline review, every coaching conversation. That's a management behaviour change, not a training problem.

  • 06

    The consultant was a certified partner for the platform they recommended

    Platform-certified consultants earn referral revenue from licence sales. This is not a conspiracy — it's the standard business model. It does create a structural incentive to recommend a particular platform regardless of fit.

  • 07

    The engagement ended at go-live, not at adoption

    Go-live is not success. It is the beginning of the hardest part. If the engagement scope ends with "system handed over," the adoption failure is already baked in before a single rep logs in.

How we actually work

Five phases. Kickoff to go-live in 6–10 weeks.
Adoption window: 90 days after that.

We don't do 6-month discovery phases. We move deliberately but quickly. The phases below represent a standard implementation — migration engagements add 2–4 weeks to phases two and three.

01
Phase 01 Week 1 — Kickoff Discovery

The Honest Audit

Before we configure anything, we spend one full week understanding how your sales team actually works — not how the org chart says they work. We interview reps individually, shadow pipeline reviews, audit your existing system (if any), and map every friction point in the current process. This is the work that most implementations skip. It's why most implementations fail.

1:1 rep interviews (every member of the sales team) Pipeline review observation — at least one live session Current system audit: what's there, what's used, what's trusted Process map: how a deal moves from lead to close in your business Friction log: every point where the current system causes workarounds Data quality assessment: what migration keeps, archives, or discards Integration inventory: every system that needs to talk to the CRM Written audit report with findings and recommendations

"In our first call, they told us they didn't think we needed a new CRM — we needed to fix the one we had. No consultant who wants your money says that. That was the moment I decided to trust them." — COO, Manufacturing, Melbourne

02
Phase 02 Weeks 2–3 — Architecture & Blueprint

The Blueprint

Based on the audit findings, we design the CRM architecture before writing a single line of configuration. Pipeline stages, required fields, automation triggers, reporting logic, permission structures, integration architecture — everything is documented and approved by you before we build it. Changes are cheap at the blueprint stage. They're expensive post-build.

Pipeline stage definitions with objective entry/exit criteria for each stage Required field logic: what reps must enter and when Automation map: every trigger, action, and notification Reporting architecture: what managers see and when Permission and role structure Integration specification: Zapier, native, or API for each connected system Data migration plan: field mapping, deduplication rules, archive criteria Signed-off blueprint document before any build begins

Blueprint sign-off is a formal milestone. No build work starts until you've reviewed and approved the architecture document. This protects you from scope creep and protects us from building the wrong thing.

03
Phase 03 Weeks 3–7 — Build, Configure & Test

Build & Test

We configure the CRM, build automations, connect integrations, migrate data (if applicable), and test everything against the blueprint. We run two testing cycles: a technical QA pass (does everything work as designed?) and a user acceptance pass (does this actually make a rep's job easier?). The second test is the one most builds skip — it's also the one that predicts adoption.

Full CRM configuration against blueprint spec Automation build and testing Integration setup, testing, and documentation Data migration: clean, map, import, validate Technical QA: every field, trigger, and automation tested User Acceptance Testing: 2–3 reps use the system in a staged environment for 3–5 days UAT feedback incorporated before go-live Admin documentation: what does what, how to maintain it
04
Phase 04 Weeks 7–10 — Go-Live & Training

Go-Live & Training

Go-live is not a handover. It's a supervised launch. We run role-specific training (reps, managers, and admins each get different sessions because their jobs are different). We're available for live support in the first two weeks. We monitor adoption data daily. We address friction points in real time — not in a two-week ticket queue.

Phased go-live (pilot team first, full team second) where practical Role-specific training: rep session, manager session, admin session Quick reference guides for each role — one page, not a manual Go-live day support (we're available, not gone) Daily adoption monitoring for first two weeks Week-2 friction debrief with sales leadership Pipeline review coaching: how to run the meeting from inside the CRM

The most dangerous week is week three. The energy of a new launch has worn off, the reps have hit their first real friction points, and the instinct to revert to spreadsheets begins. We're watching for it before you are.

05
Phase 05 Days 30–90 — The Adoption Window

The 90-Day Adoption Window

This is the phase nobody else does. We stay. We monitor weekly usage data, flag reps who are slipping back to old habits, run a Day-30 check-in with the full team, and make targeted adjustments to the configuration when the data tells us something isn't working. At Day 90, we deliver an adoption report: rep-by-rep usage, pipeline stage progression data, forecast accuracy comparison, and recommendations for the next phase.

Weekly usage data review (logged activities, pipeline progression, login frequency) Rep-level adoption flagging — we spot it before you do Day-30 group check-in: open session for reps to raise friction Day-30 configuration update cycle: fixes based on real usage data Manager coaching: reinforcing CRM-centred pipeline review habits Day-60 1:1s with any rep below adoption threshold Day-90 adoption report: rep-by-rep, pipeline health, forecast accuracy Day-90 recommendations: what to build next, what to change, what's working

The 90-day window is the thing we're most proud of. It's also the thing we invoke our guarantee against. If adoption targets aren't met at Day 90, we come back at no cost until they are.

Platform coverage

We implement all six major platforms. We recommend the right one for you — not the one we earn from.

We hold no Salesforce, HubSpot, or other vendor certifications. We earn no referral revenue from platform sales. Our platform recommendation is based entirely on your team size, sales process complexity, technical capacity, and budget.

Salesforce

Salesforce Sales Cloud

The most powerful and most commonly over-implemented CRM on the market. Right for companies with complex sales hierarchies, advanced reporting requirements, and dedicated admin capacity. Often wrong for companies under 150 people who don't have the internal resource to run it well.

Best for150–500 people, complex process, dedicated admin
Timeline8–14 weeks kickoff to go-live
Implementation$22,000–$55,000 (with migration)
Admin needOngoing dedicated Salesforce admin required
AU noteAU market: Salesforce admin talent gap is real — allow 6–8 weeks to hire in Sydney, longer in other cities
HubSpot Sales Hub

HubSpot Sales Hub

The dominant mid-market CRM for a reason. Fast implementation, intuitive for reps, unified marketing/sales data, and lower total cost of ownership than Salesforce for most companies in the 30–250 person range. Adoption rates are consistently higher in our experience — partly platform, mostly because the UX doesn't punish non-technical users.

Best for30–250 people, standard-to-moderate complexity
Timeline6–10 weeks kickoff to go-live
Implementation$15,000–$35,000 (with migration)
Admin needCan be managed by a RevOps generalist or ops manager
AU noteGrowing AU partner ecosystem — easier to find support resources than 3 years ago
Pipedrive

Pipedrive

Purpose-built for salespeople. The simplest and most rep-friendly CRM we implement — and simplicity is not a weakness when your team is 15–60 people and your priority is adoption. If your main requirement is that reps actually use the system, Pipedrive consistently outperforms more powerful platforms.

Best for15–80 people, sales-first focus, adoption priority
Timeline4–8 weeks kickoff to go-live
Implementation$12,000–$24,000 (with migration)
Admin needMinimal — manageable by a non-technical ops person
LimitationMarketing automation is limited — if you need unified marketing+sales, consider HubSpot
Zoho CRM

Zoho CRM

The highest value-per-dollar CRM in the market for companies already embedded in the Zoho ecosystem. Significantly underestimated by the mid-market. If you're using Zoho Books, Zoho Desk, or Zoho Projects, the native integration arguments for Zoho CRM are genuinely compelling.

Best forZoho ecosystem users, budget-conscious, 20–150 people
Timeline5–9 weeks kickoff to go-live
Implementation$13,000–$28,000 (with migration)
NoteGenuinely powerful when fully configured — often poorly implemented by generalist partners
Microsoft Dynamics 365

Microsoft Dynamics 365

The right choice when you're already a Microsoft-first organisation with Teams, Azure, and Power BI at the centre. Native integration with the Microsoft stack is genuinely excellent. Requires significant implementation investment and ongoing admin support — similar to Salesforce in complexity but better suited to Microsoft-standard enterprises.

Best forMicrosoft stack organisations, 150–500+ people
Timeline10–16 weeks kickoff to go-live
Implementation$28,000–$65,000 (with migration)
Admin needDedicated Dynamics admin required — plan for this headcount
Close CRM

Close CRM

Built for inside sales teams where call and email volume is high and speed-of-followup is the critical metric. If your reps are on the phone 40+ times a day, Close's native calling, power dialer, and activity-first interface is designed specifically for that workflow. Underused in the AU market despite being genuinely excellent for the right team.

Best forHigh-velocity inside sales, 10–80 reps, call-heavy teams
Timeline4–7 weeks kickoff to go-live
Implementation$12,000–$22,000 (with migration)
NoteNot a general-purpose CRM — if you have complex accounts or multi-stakeholder deals, consider HubSpot

Not sure which platform is right for you?

This is one of the most common first questions we get. Here's an honest framework. It's not exhaustive — every situation has nuance — but it covers the majority of mid-market decisions we've seen.

Your situation Platform we'd likely recommend Why
Under 80 people, first CRM, priority is adoptionPipedrive or HubSpot StarterLowest admin overhead, fastest time to rep value, easiest to course-correct
80–200 people, growing team, RevOps capacity emergingHubSpot Sales Hub ProfessionalScales with you, unified marketing+sales, no dedicated admin required
200+ people, complex sales hierarchy, dedicated adminSalesforce Sales CloudProcess depth and reporting flexibility that Salesforce does better than anyone
Already on Microsoft Teams/Azure/Power BIDynamics 365Native integrations eliminate the most painful part of any CRM implementation
Inside sales, 40+ calls/day, speed is everythingClose CRMBuilt for the workflow — activity-first, native dialer, fastest rep onboarding
Already using Zoho Books or Zoho DeskZoho CRMEcosystem integration savings outweigh any platform trade-off at this scale
Inheriting a bad Salesforce instance, not sure whether to fix or migrateDepends on the audit70% of the time: fix. 30%: migrate. We'll tell you after the audit, not before.

Honest pricing. No surprises after the proposal.

Every engagement is fixed-fee, scoped before work begins, and priced based on what your situation actually requires — not a day-rate that grows with the project. The ranges below are genuine: we have delivered engagements at the lower end and at the upper end of each.

Standard
$15k–$28k
Fixed fee · USD (AUD equivalent on request)
"We're implementing for the first time, or rebuilding what we have, on the same platform."
  • Full discovery audit (Phase 01)
  • Architecture blueprint + sign-off
  • CRM configuration: pipeline, fields, automations
  • Up to 3 integrations (Zapier or native)
  • Role-specific training: reps, managers, admin
  • Go-live support: 2 weeks dedicated availability
  • 90-day adoption monitoring and check-ins
  • Day-90 adoption report
  • Teams of up to 40 reps
Complex / Enterprise
$35k–$65k
Fixed fee · Scoped on engagement
"We have multiple regions, multiple systems to migrate from, or complex hierarchy requirements."
  • Everything in Migration, plus:
  • Multi-region or multi-team rollout coordination
  • Multi-source data migration (2+ legacy systems)
  • Custom object / advanced data model design
  • Advanced reporting and forecasting architecture
  • API integrations with ERP or legacy systems
  • Extended adoption program: up to 120 days
  • Sales leadership coaching (manager behaviour change)
  • Teams of 80+ reps or complex hierarchy
💡

What's not included — and why we tell you upfront

CRM software licences are not included in our fee. We recommend you purchase them directly from the vendor — we have no referral arrangements and you'll get the same (or better) price without us in the middle. If your engagement requires custom development work beyond standard CRM configuration (custom-coded integrations, bespoke API builds, complex Apex/Salesforce development), this will be scoped and priced separately before any such work begins. We will always tell you before we start whether something is in scope or not.

Three implementations. The full story — not just the headline.

Real engagements, specific numbers, honest accounts of what went wrong before us and what changed after. No sanitised client wins.

Salesforce Rescue B2B SaaS Austin, TX 22 reps

"I've been through three CRM implementations. This was the first one where I wasn't apologising to my reps six months later."

89%
Rep adoption at Day 90

The situation

A $45M ARR B2B SaaS company in Austin had been on Salesforce for 18 months. Implementation had been handled by a Salesforce partner at a cost of $85,000. Adoption at the 12-month mark was 34% — less than a third of reps were logging activities consistently. Monday pipeline reviews still ran from a shared Google Sheet because the VP of Sales didn't trust the CRM numbers.

The root cause: the implementation had been designed around the forecast dashboards the CEO wanted, not around what a rep needed to do their job. Every activity required 8–12 fields to be filled in. Stage definitions were vague. Nobody had talked to a rep before configuring anything.

What we changed

We started with a full rep audit — individual 30-minute conversations with all 22 reps. The core friction became clear immediately: reps were spending 12 minutes per deal updating Salesforce after every call, which they described as "punishment for making calls." We rebuilt the activity logging flow to require exactly three fields (outcome, next step, next date). Everything else became optional.

We redesigned pipeline stages with objective, rep-verifiable criteria for each stage transition. Rebuilt the forecast rollup from scratch. Connected Outreach via native integration so call logs appeared automatically. The entire rebuild took 6 weeks.

The 90-day adoption window

At Day 14, two reps had reverted to working primarily from email. We identified the specific friction point — a broken integration with their email sequencing tool that meant sequences weren't showing on the contact record. Fixed within 48 hours. Both reps returned to consistent CRM use by Day 20.

At Day 30, we ran a group session where reps could raise anything that was slowing them down. Four items. Three were configuration fixes we made the same week. One was a management behaviour change we coached the VP of Sales through: stop asking for numbers not in the CRM, full stop.

At Day 90, the pipeline review ran entirely inside Salesforce for the first time. The VP of Sales closed the Google Sheet.

Honest reflection

The system we built is less feature-rich than what the previous partner built. It does fewer things. It does the things that matter well, and it asks less of the people using it. That tradeoff — capability for usability — is the right one for a 22-person sales team. Any consultant who tells you otherwise is probably selling you features you won't use.

34%→89%
Rep adoption rate at Day 90 vs. 12 months prior
12→3 min
Per-deal update time after activity logging rebuild
Week 10
First pipeline review run entirely inside Salesforce
$0
Additional spend — no new licences, no new platform
"I've managed sales teams for 22 years. I've been through three CRM implementations. This was the first one where I wasn't apologising to my reps six months later. The difference was that RevOps Central stayed. They were there at week eight when two reps started slipping back to spreadsheets. They spotted it before I did."
DK
David Kauffman
VP Sales · B2B SaaS · Austin, TX · Salesforce
HubSpot Implementation Manufacturing Melbourne, AU 35 reps

First-ever CRM for a 35-person manufacturing sales team. Go-live to 82% adoption in 8 weeks.

8 wks
Kickoff to 82% adoption

The situation

A Melbourne-based industrial equipment distributor had been operating without a CRM since founding. Deals were tracked in a combination of Excel, a shared Outlook calendar, and the institutional memory of five senior reps who had been with the business for more than a decade. The General Manager had no pipeline visibility and could not reliably forecast revenue more than 4 weeks out.

The COO had attempted a Salesforce implementation two years prior that was abandoned before go-live when three senior reps said they would leave if the rollout proceeded. The team was deeply resistant — and with legitimate reason, given what they'd seen of Salesforce.

Platform recommendation

Our audit identified HubSpot Sales Hub Professional as the right choice. The team's sales process was straightforward (6 stages, consultative sell, no complex multi-stakeholder hierarchy). The GM needed a clean pipeline view and forecast report. The reps needed something they could update in under two minutes per deal. HubSpot delivered all three. Salesforce would have been overkill by a factor of four.

The resistance challenge

We spent the first two weeks with reps rather than in the system. Individual conversations. Shadow days. Understanding why the previous Salesforce attempt failed (it asked too much, gave nothing back, and was visibly designed for reporting rather than selling). We showed reps the prototype before building it. They shaped it. Three of the five senior reps became advocates instead of resistors.

What we built

Six-stage pipeline with objective criteria for each stage transition, written in the language the team used, not CRM vocabulary. Mobile-first design (reps visited customers on-site constantly). Automatic email logging via HubSpot Sales Extension. A single GM dashboard that showed pipeline value by stage, weighted by stage probability, with forecast accuracy comparison month-over-month. Built in 5 weeks.

Day 90

82% adoption. The GM ran his first pipeline forecast in HubSpot and described it as "the first time I actually trust what I'm looking at." The five-rep resistance group had become the five most vocal advocates. One of them built a personal productivity workflow inside HubSpot that we later rolled out to the full team.

82%
Rep adoption at Day 90
5 wks
Kickoff to go-live
+22yrs
Of deal history preserved from Excel migration
4 wks→6 mo
Forecast horizon before and after
"I was sceptical. We'd been burnt twice before. What got me was that in our first call, they told us they didn't think we needed a new CRM — we needed to fix the process first. Then they came and sat with my reps for two weeks before touching the system. That's not what consultants do. That's what it should look like."
TN
Tessa Nguyen
COO · Industrial Equipment · Melbourne, AU · HubSpot
Pipedrive → HubSpot Migration Technology Services Denver, CO 18 reps

Migrating 4 years of Pipedrive data to HubSpot without losing deal history or trust.

100%
Data fidelity post-migration

The situation

A Denver-based technology services company had outgrown Pipedrive. The marketing team had grown to 6 people running independent campaigns with no visibility into sales pipeline. There was no unified view of a contact's journey from marketing lead to closed customer. The sales team had 4 years of deal history in Pipedrive, including notes, email threads, and activity logs that were critical for account management.

Their biggest fear: losing the institutional knowledge stored in Pipedrive's note fields. Some deals had 80+ notes from over 3 years of relationship-building. This wasn't just data — it was account context that reps depended on daily.

The migration approach

We began with a full data audit of the Pipedrive instance: 4,200 contacts, 890 organisations, 1,400 deals (open and closed), and 28,000 notes and activity records. First step was a quality audit: 340 duplicate contacts identified and merged pre-migration. 180 contacts with no activity in 4+ years archived rather than migrated. Deal associations cleaned up — 12% had no linked contact, which would have caused orphaned records in HubSpot.

The technical migration

Custom field mapping between Pipedrive and HubSpot was the most complex part. Pipedrive's custom fields don't map directly to HubSpot's data model. We documented every field, its source values, and its destination equivalent. For 8 custom fields with no HubSpot equivalent, we built custom properties before migration. Notes were migrated as engagement records with original timestamps preserved — critical for account history continuity.

The migration ran overnight on a Thursday. By Friday morning, the complete 4-year deal history was available in HubSpot with all note content, timestamps, and deal associations intact. Not a single note was lost.

What they got

Beyond the data fidelity, the HubSpot build gave the marketing team full visibility into the pipeline for the first time. They could see which marketing contacts had become opportunities, which campaigns were generating deals that actually closed, and where leads were dropping out of the sales process. The first month-end report after migration included marketing attribution data that had never existed before — a direct answer to the CEO's long-standing question about which marketing channels were actually driving revenue.

28,000
Activity records migrated with original timestamps
100%
Note content fidelity — zero records lost
9 wks
Kickoff to go-live including migration
First time
Marketing attribution data existed in the business
"We were terrified about losing the notes. Four years of account history lives in those notes — specific conversations, commitments, context. The fact that we came out the other side with everything intact, timestamped and linked correctly, was the thing I was most relieved about. The HubSpot build was excellent, but honestly the migration confidence was what sold me."
JP
James Pollard
VP Sales · Technology Services · Denver, CO · Pipedrive → HubSpot
The 90-day adoption guarantee

We don't consider the job done until your team is actually using it.

Go-live is a milestone, not a finish line. Every CRM implementation we deliver includes a 90-day adoption window — active monitoring, weekly check-ins, targeted configuration adjustments, and rep-level coaching where needed. If adoption targets aren't being met at Day 90, we come back at no additional cost until they are.

Adoption targets agreed before we startWe define what "adopted" means for your team in the Blueprint phase. Specific rep usage thresholds, pipeline stage progression rates, and forecast accuracy benchmarks. Not vague goals — measurable ones.
Weekly usage monitoring throughout the 90 daysWe review usage data every week: login frequency, activity logging rates, pipeline progression, stage stagnation. We flag issues before they become habits.
If targets aren't met at Day 90, we return at no costWe define the return scope in the guarantee terms: additional rep coaching sessions, targeted configuration changes, management behaviour coaching. We have exercised this guarantee 8 times across 60+ engagements.
What the guarantee doesn't coverSituations where the client has made major unilateral changes to the configuration post-go-live, or where the sales team has changed by more than 40% since kickoff. Both scenarios are real reasons adoptions fail — they're also reasons a guarantee can't reasonably apply.

The number that matters to us

We track our Day-90 adoption rate across every engagement we've delivered. It's the number we hold ourselves accountable to internally, and the number we think the market should use to evaluate CRM implementation partners.

82%
Average rep adoption rate across all engagements at Day 90
Industry benchmark: 26% (CSO Insights)

We're not claiming perfection. We've delivered 5 engagements where Day-90 adoption was below our targets. In four of those, we returned and got to target by Day 120. In one, we didn't — the CEO changed the sales team structure mid-engagement and adoption effectively restarted from zero. We refunded a portion of the fee.

Talk to us about your situation →
Who you're working with

The person on the discovery call is the person who does your engagement.

We don't sell senior and deliver junior. Every engagement is led by Rishabh or Sarah, not handed to a project coordinator after the proposal is signed.

RS

Rishabh Soni

Senior CRM Strategist · US Market Lead · Based in Austin, TX

Rishabh spent 9 years in B2B sales and sales operations roles across Austin and San Francisco before moving into CRM consulting in 2018. His sales career included three years as a Salesforce power user at a PE-backed distribution company — which is where he developed his conviction that most CRM implementations fail not because of bad technology but because of bad implementation practice.

He has led 38 CRM implementations and 14 migrations across Salesforce, HubSpot, Pipedrive, and Zoho. His primary focus is US mid-market clients between 30 and 350 people. He has a particular speciality in Salesforce rescue engagements — companies who've had a failed or underperforming Salesforce implementation and need to determine whether to fix or migrate.

He does not hold Salesforce, HubSpot, or any other vendor certifications. This is deliberate.

38 CRM implementations across Salesforce, HubSpot, Pipedrive, Zoho
14 migrations, including 6 multi-source consolidations
9 years prior in B2B sales and sales operations
Speciality: Salesforce rescue and adoption recovery
US time zones: CT, MT, PT — all covered
LinkedIn profile
SR

Sarah Rao

AU Market Lead · Senior CRM Consultant · Based in Sydney, NSW

Sarah spent 7 years in B2B sales leadership and sales operations across Sydney and Melbourne before founding the Australian practice of RevOps Central in 2021. Her background spans manufacturing distribution, technology services, and professional services — the three sectors that dominate mid-market B2B sales in Australia, and the three sectors where CRM implementation challenges are most acute.

She has a specific focus on the Australian mid-market context: the talent gap for CRM admins outside Sydney and Melbourne, the different sales culture in Australian B2B (relationship-led, longer cycles, higher resistance to activity tracking than US counterparts), and the nuances of implementing US-developed CRM platforms for teams with distinctly different working patterns.

She leads all Australian engagements and jointly leads US engagements with cross-market clients. She is fluent in HubSpot, Pipedrive, and Salesforce implementations, and has particular depth in the manufacturing and distribution sectors.

24 CRM implementations across HubSpot, Pipedrive, Zoho, Salesforce
9 migrations, including 3 from on-premise legacy systems
7 years prior in B2B sales leadership in AU manufacturing and tech
Speciality: First-CRM implementations for AU mid-market companies
AU time zones: AEST, AEDT — all covered
LinkedIn profile
What clients say

From people who've been here before and were understandably sceptical.

Every quote below is from a real client. We've included the platform, team size, and context for each because we think those details matter when you're evaluating whether this is the right conversation for your situation.

HubSpot · Professional Services · 45 people · Sydney
★★★★★
"The pipeline stage workshop was the single most valuable 2 hours we've had as a leadership team this year. It forced us to articulate what 'qualified' actually means in our business — something we'd been arguing about for 4 years without resolution. The CRM just made the argument finally worth having."
MK
Michelle Kamau
CEO · Professional Services · Sydney, NSW
Salesforce → HubSpot Migration · B2B SaaS · 90 people · Chicago
★★★★★
"What convinced me was that they told us what they thought in the first call, not after we'd signed. They looked at our Salesforce setup and said 'you don't need this level of platform — you need a CRM that your team will actually use.' That kind of honesty is rare enough to be a differentiator."
BR
Ben Rafferty
CRO · B2B SaaS · Chicago, IL
Pipedrive · Industrial Services · 28 people · Brisbane
★★★★★
"We're 28 people and I wasn't sure a consulting engagement was the right call — felt like something bigger companies did. What I got was a CRM that my team actually uses, a forecast I trust for the first time, and a GM pipeline meeting that now runs from data rather than from whoever shouts loudest."
LF
Lachlan Ford
Managing Director · Industrial Services · Brisbane, QLD
Zoho CRM · Manufacturing · 65 people · Denver
★★★★★
"Three things stood out: they interviewed every rep before touching the system, they pushed back on two of my requirements because they'd seen them fail before, and they were still available at week eight when I had a question about the forecast model. That's a different relationship than what I've had with other consultants."
AM
Alex Morrison
VP Sales · Manufacturing · Denver, CO

Questions we get on every discovery call.

We'd rather answer them here so the 45 minutes we spend together can go deeper than the basics.

01

How much does a CRM implementation cost?

A standard implementation (no migration, up to 40 reps) runs $15,000–$28,000. Implementation with data migration runs $24,000–$45,000 for most mid-market scopes. Complex or multi-region engagements run $35,000–$65,000. All fees are fixed, scoped before work begins, and do not include CRM software licences (which you purchase directly from the vendor). We don't do hourly billing.

02

How long does a CRM implementation take?

Kickoff to go-live: 6–10 weeks for a standard implementation on a platform you're new to, or rebuilding your current one. 8–14 weeks if a migration from another CRM is involved. The 90-day adoption period runs after go-live. We don't do 6-month discovery phases. If an engagement will take longer than 14 weeks, we'll tell you upfront before you sign anything.

03

Which CRM platforms do you implement?

We implement Salesforce Sales Cloud, HubSpot Sales Hub, Pipedrive, Zoho CRM, Microsoft Dynamics 365, and Close CRM. We are platform-agnostic — we hold no vendor certifications, earn no referral revenue from platform sales, and will tell you if we think a platform isn't right for your situation, even if you've already decided you want it.

04

What does the 90-day adoption guarantee actually mean?

We agree on specific adoption targets in the Blueprint phase — rep usage thresholds, pipeline progression rates, and forecast accuracy benchmarks. If those targets aren't met at Day 90, we return at no additional cost to diagnose and fix the specific issues causing the shortfall. We've exercised this guarantee 8 times across 60+ engagements. In 7 of those cases, we got to target. In one case, a mid-engagement team restructure meant adoption effectively restarted — we refunded part of the fee.

05

We've had a previous failed implementation. Should we try again?

73% of our implementation clients had a previous failed attempt. If you've failed before, we start with an honest conversation about what went wrong before proposing anything. In most cases, the failure wasn't the platform — it was the process and adoption approach. We'll tell you whether we think the problem is fixable on your current platform or requires migration. If we think the engagement isn't right for us to take on, we'll tell you that too.

06

We're only 30 people. Is a consulting engagement worth it at our size?

30 people is often the ideal size for this engagement. You're big enough that informal processes are starting to break down, but small enough that we can design the system around your specific process rather than a generic mid-market template. The scope is smaller, the timeline is faster, and adoption is often easier because we can run sessions with every rep rather than rolling out across multiple regions. Some of our most successful engagements have been with 25–40 person companies.

07

Do we need to have chosen a platform before talking to you?

No. Platform selection is often part of our audit process. If you've already chosen and we think it's the wrong choice, we'll tell you — with our reasoning — and respect your decision if you proceed anyway. If you haven't chosen, we'll give you a recommendation based on the audit findings. We won't recommend a platform because we earn from it. We will recommend one because we think it's right for your situation.

08

What happens to our existing data if we're migrating?

Before any migration, we run a full data audit of your source system: contacts, companies, deals, activities, custom fields, notes. We identify duplicates, junk records, and data quality issues. We clean the data before migration — not after. We document every field mapping and get your sign-off before moving anything. Notes, activity history, and deal records are preserved with original timestamps. We've never delivered a migration where data was lost. We've delivered migrations where data should have been archived rather than moved — which is a different thing, and always discussed with you first.

09

What questions should I ask a CRM consultant before hiring them?

Five questions we'd recommend: (1) Do you hold certifications for the platform you're recommending, and do you earn referral revenue from licence sales? (2) What does your engagement scope after go-live look like — are you still available at week eight? (3) How do you measure success — what specific metrics define a successful implementation? (4) Can you tell me about an engagement that didn't go well and what you did about it? (5) Who actually does the work — the person in this call, or someone else? Any consultant who hedges on any of those questions is worth scrutinising carefully.

10

What's your CRM adoption rate at Day 90?

Our average Day-90 rep adoption rate across all engagements is 82%. The industry benchmark from CSO Insights is 26% — meaning fewer than 40% of companies achieve 90%+ adoption. We're not perfect: we've had 5 engagements below our agreed targets at Day 90. In 4 of those, we returned and got to target. We think the willingness to be specific about this number — rather than vague about "high adoption outcomes" — is part of what makes us credible as a partner.

11

Do you work with both US and Australian companies?

Yes. Our US practice is led by Rishabh Soni from Austin, TX, covering all US time zones. Our Australian practice is led by Sarah Rao from Sydney, covering AEST and AEDT. We have a specific Australian market focus because the mid-market CRM challenge in Australia has meaningful differences from the US context — particularly around CRM admin talent availability, sales culture, and the practical implications of choosing a US-developed platform for an Australian sales team.

12

What if we need an ongoing RevOps partner after the implementation?

We offer an ongoing RevOps Support service — a monthly retained engagement for companies that need a continuing CRM operations partner without hiring a full-time admin. Engagements typically run $2,500–$5,000/month and cover configuration maintenance, reporting updates, new integration builds, and quarterly strategic reviews. About 40% of our implementation clients move into this arrangement after the 90-day adoption window closes. We'll discuss it if it seems relevant — we won't push it if it doesn't.

Free · No pressure · 45 minutes

Book a call with
Rishabh or Sarah

Tell us where you are. We'll tell you what we see — honestly. Even if the honest answer is that you don't need a CRM implementation right now.

You speak to a senior consultant
Rishabh or Sarah directly — not a BDR or project coordinator.
We give you a real opinion
If you don't need an implementation — or if you need something different — we'll tell you.
No pitch deck, no follow-up sequence
One conversation. You decide what happens next.
US & Australia time zones
Austin TX · Denver CO · Sydney NSW · Melbourne VIC
What happens next
1. Fill in the form (2 min). 2. We email within 1 business day. 3. 45-min call. 4. You get a specific recommendation — whether or not that recommendation is to hire us.

Tell us about your situation

No drip sequences. No sales follow-up if you don't want one.